Priority
Short-term Projects
1st
Priority:
§
Install a
right-turn lane onto the
2nd
Priority:
§
Manage right
turns onto southbound
§
Upgrade the
intersection and continuous right turn lanes at
3rd
Priority:
§
Upgrade the
intersection and add turning/acceleration lanes at WV 705 and the Mileground
(WVDOH 2002 Intersections Report)
4th
Priority:
§
With known
future residential growth at approximately 1,600 housing units that will add to
traffic, upgrade the intersection and double turning lanes at
§
Upgrade the
intersection and add continuous turn lane(s) at the
5th
Priority:
§
Upgrade the
intersection and install turning lanes at
§
Add a lane of
pavement eastbound on WV 705 between
§
Upgrade the
intersection and add turning and acceleration lanes at the Mileground and
6th
Priority:
§
Upgrade the
intersection and add continuous turning/acceleration lanes at WV 705 and
7th
Priority:
§
Limit left hand
turns from southbound
§
Adjust the
traffic stop on southbound
§
Upgrade the
intersection and add continuous turning/acceleration lanes at WV 705 and
8th
Priority:
§
Install a
weekly timer on the
§
Upgrade the
intersection at
§
Install
directional lane lights on the Mileground to utilize majority lanes for heavier
traffic depending on the time of day (morning and evening commutes)
§
Add an
acceleration lane on
§
Upgrade the
intersection and add turning/acceleration lanes at Route 7 and