Public Announcements:
Don Spencer
provided the group with a statement from the Morgantown Municipal Bicycle Board
which recommended projects that encouraged non-motorized transportation. The statement also strongly recommended the
use of public transit. Greg Good wanted
to make sure that the bike/ped alternative was being considered equally among
each of the highway projects that are being proposed.
III.
Housekeeping:
There were no housekeeping issues presented at this time.
IV.
Keith Johnson,
URS consultant, started the meeting by informing the group of what the
Technical Advisory Committee has done.
The Preliminary Recommended System Improvement which consists of two
plans: The Cost Constrained Plan which
is limited to the 233 million dollar funding allotment and the Illustrative
Plan which identifies needs within the region but is outside of the funding
constraints. The items in the
Illustrative Plan are alternatives that need to be moved into the next
transportation plan or find additional funding for.
Out of the eight
transportation concepts that were generated by URS, the Technical Advisory
Committee is currently considering concepts 8A and 8B.
The first,
Concept 8A includes the expansion of the Beechurst Corridor to a five
lane. The second, Concept 8B removes the
expansion of Beechurst which allows a positive funding balance of approximately
37 million dollars which already assumes approximately 10 million dollars in
Transportation System Management (TSM) projects along
As for the
Non-Motorized System Funding, a handout was given that separated the Project
Improvement List into tiers. The
Project Improvement List totals about 41.5 million dollars. Divided out over the next 25 years, that
equals about 1.7 million dollars per year for the Non-Motorized Funding. The current annual allocation averages about
$350,000 per year. In the Regional Plan,
URS would like to increase the annual allocation by $100,000 totaling $450,000
per year for the Non-Motorized System Funding. The idea is that when funding comes along,
tier 1 projects will be completed followed by tiers 2 and 3.
Improvements to
the Transit System will consist of an additional $300,000 per year over the
next 20 years.